Featured Article

Turtle Covers needed state-of-the-art heating system

Combat Heating Solutions Ltd were able to provide the ideal replacement for the new building by installing 2 x ELC55-105 oil fired floor standing cabinet heaters in the workshop and 1 x ELO55-105 floor standing heater in the machine shop. Both the main workshop and sewing room were to be heated...

Read More

Turtle Covers needed state-of-the-art heating system

Combat Heating Solutions Ltd were able to provide the ideal replacement for the new building by installing 2 x ELC55-105 oil fired floor standing cabinet heaters in the workshop and 1 x ELO55-105 floor standing heater in the machine shop. Both the main workshop and sewing room were to be heated...

Read More

Case Study: Radiant Tube Heating for Four Pure Brewery, London

Following a £500,000.00 investment Four Pure Brewing opened a new taproom based in London which was set to ‘blow people away’.  The new facility includes a bespoke horseshoe bar with 43 taps, a reception room, brewery shop, meetings areas and a live music area.

Read More

Industrial Gas Heating Solutions for Digital Advanced Control

Combat Heating Solutions Ltd were able to provide the ideal solution for the new building by installing 2 x Elite ELG135 floor standing NG cabinet heaters.  The previous building had a radiant system in place but due to the ceilings in the new warehouse being very high the company felt that a warm...

Read More

Chemical Factory Benefits from Energy Efficient Heating System.

Read More